Not all water pickup is equal — a shop vac and a truck-mount extraction unit produce very different outcomes on the same flooded room.
We classify every loss as Category 1, 2, or 3 before extraction begins, then document readings throughout the job.

Truck-mount extraction is standard equipment on every Hurlburt Field, FL call, not an upgrade.
We identify the contamination category before extraction to determine the correct safety protocol.
We use specialty injection systems designed to dry hardwood from underneath rather than defaulting to tear-out.
Our Hurlburt Field, FL extraction reports give your insurer verifiable data, not a vague summary.
Water Extraction is a methodology as much as a piece of equipment, and here's how our Hurlburt Field, FL crews approach it.

Truck-mount capacity lets us clear a flooded room significantly faster than portable units alone.
Classification testing happens on-site before any extraction equipment starts running.
Carpet and pad get separately assessed — pad usually can't be saved, but carpet often can with fast, thorough extraction.
This specialty method can save original hardwood that would otherwise require full tear-out.
We check subfloor moisture at multiple points, not just where the visible water pooled.
Every job closes with a written extraction report showing before-and-after moisture readings.
A quick call helps us determine truck-mount versus portable equipment needs before we arrive.
A technician heads out immediately with truck-mount or portable units as needed.
We test and classify the water, then provide a written quote before extraction begins.
Extraction continues until documented moisture readings confirm the job is complete.

"They saved our hardwood floor with an injection drying method instead of ripping it all out. Saved us thousands." — Owen R.
"The moisture readings they gave us before and after made the whole process feel legitimate, not just a guess." — Bianca V.
"Truck-mount extraction cleared our flooded basement way faster than the shop vac approach a different company tried first." — Malik J.
Our Water Extraction process tests, extracts, and verifies with logged readings, well beyond a simple pump-out.
We'll assess whether injection drying is viable before recommending tear-out.
Classification determines the safety protocol and disposal requirements for the job.
Yes, every job includes a written report with before-and-after moisture readings.
We prioritize speed specifically because extraction timing affects final outcomes.
Yes, every extraction job closes with a documented report showing classification results and moisture readings.
If you're in or near Hurlburt Field, an extraction crew can typically respond the same day.

Speak with a real Hurlburt Field, FL technician, not an automated system.
Call +1-844-578-1604